PCB socket DB1EVM-3.81

PCB Housing, Nominal Cross Section: 1.5 mm2, Color: Green, Nominal Operating Current: 12 A, Rated Voltage (III/2): 160 V, Contact Surface: Tin, Contact Type: Pin Connector, Number of Potentials: 2-24, Number of Rows: 1, Number of Positions: 2-24, Connections: 2-24, Product Family: DB1EVM, Pitch: 3.81 mm, Mounting: Wave Soldering, Pin Alignment: Straight, Pin [P]: 3.4 mm, Number of Pins per Potential: 1, Insertion System: COM Pin Pitch: 3.81 mm, Mounting: Wave Soldering, Pin Alignment: Straight Alignment, Pin [P]: 3.4 mm, Number of Pins per Potential: 1, Insertion System: COMBICON DB1EVM, Pin Connector Style Alignment: Standard, Interlock: Not Available, Mounting: Not Available, Package Type: Carton

Advantages

☑Universal mounting for global use
☑Vertical connection allows for multiple rows on the PCB
☑Ensures a high degree of flexibility in device design - just one socket for connectors that utilize different connection technologies
0
Views: 875
Contact usDownload PDF View 3D Download CAD
  •  

    Technical Data-UL/CUL

    Use Group
    B C D
    Rate Voltage [V]
    300 - 300
    Rated Current [A]
    12 - 10
    Wire Range [AWG]
    /
    Dielectric Voltage-Withstand
    2500V/Min

     

    Technical Data-IEC

    Overvoltage Category
    III III II
    Contamination Class
    3 2 2
    Rated Voltage [V]
    160 160 250
    Rated Current [A]
    10 10 12
    Impulse withstand voltage [KV]
    2.5 2.5 2.5
    Conductor cross section [mm²]
    /

     

    Material Information 

    Insulation Material
    PA66
    Flame relardant rating
    UL94V-0
    Conductor Material
    Copper alloy
    Plating of conductor surface
    Sn plated

     

    General Parameters

    Pitch/Poles [mm]/[P]
    3.81/2~24
    Stripping Length [mm]
    /
    Screw/Torque(Max)[N.m]
    /
    Operating temperature [℃]
    -40~+105
    Soldering temperature
    250℃/5S
    Pin dimensions [mm]
     
    PCB Hole Diameter [mm]
    Ø1.70

     

     

    Size Chart

     

     

    PCB opening diagram

     

     

     

           

Contact us

Please tick the product category you are interested in*(Can be checked)

Shrapnel terminal block
Lifting terminal block
Plug-in terminal block
Barrier terminal block
Spring-type terminal block
Feed-through terminal block
Rail terminal block
Wiring terminal block

  • MrMiss
top