PCB socket DB1EVM-5.08

PCB Housing, Cross-sectional rating: 1.5 mm2, Color: Green, Current rating: 8 A, Voltage rating (III/2): 320 V, Contact surface: Tin, Contact type: Pin connector, Number of potentials: 2-24, Number of rows: 1, Number of digits: 2-24, Connections: 2-24, Product family: DB1ERM, Pin pitch: 5.08 mm, Mounting: Wave Soldering, Pin Alignment: Straight Alignment, Pin [P]: 3.4 mm, Number of Pins per Potential: 1, Insertion System: COMBICON DB1EVM, Pin Connector Style Alignment: Standard, Interlock: Screw Fastening, Mounting: Screw Flange, Package Type: Carton Packaging

Advantages

☑Universal mounting for worldwide use</div
☑Bolt flange ensures high mechanical stability
☑Ensures a high degree of flexibility in device design - only one socket is required for connectors that utilize different connection technologies
0
Views: 653
Contact usDownload PDF View 3D Download CAD
  •  

    Technical Data-UL/CUL

     

    Use Group
    B C D
    Rate Voltage [V]
    300 - 300
    Rated Current [A]
    8 - 8
    Wire Range [AWG]
    /
    Dielectric Voltage-Withstand
    1.6KV

     

    Technical Data-IEC

     

    Overvoltage Category
    III III II
    Contamination Class
    3 2 2
    Rated Voltage [V]
    250 320 630
    Rated Current [A]
    8 8 8
    Impulse withstand voltage [KV]
    4 4 4
    Conductor cross section [mm²]
    /

     

    Material Information

     

    Insulation Material
    PA66
    Flame relardant rating
    UL94V-0
    Conductor Material
    Copper alloy
    Plating of conductor surface
    Sn plated

     

    General Parameters

     

    Pitch/Poles [mm]/[P]
    5.08/2-24
    Stripping Length [mm]
    /
    Screw/Torque(Max)[N.m]
    /
    Operating temperature [℃]
    -40~+105
    Soldering temperature
    /
    Pin dimensions [mm]
    /
    PCB Hole Diameter [mm]
    /

     

     

    Size Chart

     

     

    PCB opening diagram

     

     

     

           

Contact us

Please tick the product category you are interested in*(Can be checked)

Shrapnel terminal block
Lifting terminal block
Plug-in terminal block
Barrier terminal block
Spring-type terminal block
Feed-through terminal block
Rail terminal block
Wiring terminal block

  • MrMiss
top